Te Ahu a Tūranga – Manawatū Tararua Highway

The project

More than 1.6 million native plants and around 110 hectares of hydroseeding, on one of the largest roading projects in the lower North Island. Since 2021 Evergreen Landcare has been revegetating and stabilising the new highway that replaces the Manawatū Gorge road. We are still on site today, looking after the planting through its five-year establishment period.

Te Ahu a Tūranga is the 11.5 km highway that replaces State Highway 3 through the Manawatū Gorge, closed by slips in 2017. The route climbs over steep, erosion-prone hill country, which meant large cut and fill faces that had to be stabilised and revegetated quickly.

Evergreen Landcare holds the landscape, grassing and revegetation subcontract. We work across the main alignment and across a network of ecological offset and mitigation sites on neighbouring farms, reserves and stream corridors. It is one of our longest-running contracts.

At a glance
  • 1.6 million+ native plants installed
  • Around 110 hectares hydroseeded
  • 8 planting and offset sites
  • Around 240 hectares of pre-planting weed control
  • 63,500 m² of erosion control matting
  • Five years and counting on site, since May 2021
What we delivered

Planting

We have planted more than 1.6 million native plants. Around a third went on the highway itself: swales, wetlands, cut and fill faces, Gateway Park and the roundabouts, including 337 specimen trees. The rest established new native habitat at the offset sites, from Raatahiwi and Beagley–Wharite to the Meridian stream diversion and Parahaki Island.

Remote offset sites were planted using helicopter lifts. Our crews also set out and trained iwi planting teams working alongside us. When the millionth plant went in, the crew took the afternoon off to celebrate.

Hydroseeding and slope stabilisation

We hydroseeded around 110 hectares, most of it permanent grassing on the highway’s cut and fill faces across four zones. Temporary hydroseeding protected bare ground on farms with difficult access. On the steepest faces we added hydro hay and bonded fibre matrix, along with rock-face stabilisation on Cut 13.

Erosion and sediment control

  • 63,500 m² of erosion control matting in swales and wetlands
  • About 1,700 m of silt fence and a check dam
  • 24,500 m² of hay mulch, and hand mulching of critical tie-in areas

Ground preparation

  • About 240 ha of pre-planting weed control and over 800,000 spot sprays
  • Fertiliser and lime over 30 ha, plus topsoil remediation over 13 ha

Maintenance and pest control

  • Plant and grass maintenance, including remote-controlled mowing on steep slopes across 58 ha
  • Weed control for blackberry, gorse, ivy and stream-edge pest plants
  • Animal pest control, plant guards and repellent to protect young plants
Where it stands today

The capital works are complete: all planting, hydroseeding, erosion control and maintenance to Practical Completion. We are now in the 60-month Defects Liability Period. Through it, our crews maintain the planting and grassing so the new native cover establishes and the slopes stay stable. Depending on the area, this work runs to between 2028 and 2030.